KBReno_Admin

KBReno_Admin

Shower Room with Underfloor Heating Chislehurst

By |May 1st, 2024|Categories: Shower Room|

In Chislehurst, the client sought to revamp their compact shower space and incorporate underfloor heating. The project entailed stripping away the shower enclosure, towel rail, basin, and W/C, as well as all existing tiles and flooring. Electrical adjustments were made to accommodate mirror lights, towel rail lights, and underfloor heating. Subsequently, all surfaces received a fresh coat of plaster. Plumbing alterations were carried out as needed. A new shower unit and tray were then installed, complemented by panels in the shower area. The floor was prepped for underfloor heating, followed by tiling and grouting. Wall tiling and grouting were

Cylinder System to Worcester Bosch Combi Boiler in West Wickham

By |April 24th, 2024|Categories: Heating|

A homeowner in West Wickham asked KB Renovations to update their heating system and improve efficiency by converting from a traditional cylinder system to a combi boiler. The conversion required careful planning to ensure compatibility with existing infrastructure while optimising space and energy usage. Additionally, the installation needed to comply with local regulations and safety standards. After consultation, the decision was made to install a Worcester Bosch combi boiler, renowned for its reliability and energy efficiency. KB Renovations conducted a full assessment of the property to determine the optimal placement and configuration for the new boiler. The conversion to

Family Bathroom Refurbishment West Wickham

By |April 23rd, 2024|Categories: Bathroom|

In West Wickham, KB Renovations were tasked with the refurbishment of a family bathroom. The customer chose the bathroom suite and tiles they wanted including a glass shower partition, towel rail and vanity sink unit. We fitted new electrics and plumbing including power for a mirror cabinet (yet to be fitted). Walls were plastered then the new suite was installed. We tiled half of the wall for a 50/50 plaster - tiled effect and also the floor. Finally the room was painted and sealed. What we did Area Date Project Time Family Bathroom Refurbishment West

Loft Bathroom Fitted in Bromley

By |April 23rd, 2024|Categories: Uncategorized|

KB Renovations fitted a new shower room in a newly constructed loft conversion in Bromley. New electrics and plumbing were installed before the walls were freshly plastered. We then tiled the floor and walls in different styles and then fitted a new vanity unit, towel rail and shower and toilet. What we did Area Date Project Time Loft Bathroom Bromley 2024 3 days Project Results

Bath and Shower Room Fitted Beckenham

By |April 15th, 2024|Categories: Bathroom|

KBRenovations were asked to modernise an old bathroom at a house in Beckenham. Our client wanted a stylish modern look so choose different styles of tiles for the floor, walls and shower including a floral patterned tile for the floor. The old bathroom was removed and new plumbing and electrics were installed. We plastered all walls and ceiling and then installed the new glass framed shower, modern vanity unit, chrome towel rail and cupboard. We cut the tiles around the suite and finally painted the ceiling. The result is a very stylish and modern bathroom.

Loft Bathroom Catford

By |April 15th, 2024|Categories: Bathroom|

This bathroom was fitted by KB Renovations in the customers newly renovated loft conversion in Catford SE6. The customer choose the bathroom tiles and a bath built in with shower unit above, small sink and a toilet as well as a towel rail. We tiled the floor, walls around bath and the side of the bath. Next, we fitted skirting boards.  We fitted a towel rail and an extractor fan, sink and toilet and then painted the room. What we did Area Date Project Time Loft Bathroom Catford 2023 5 Days

New Bathroom Fitted in West Wickham

By |April 15th, 2024|Categories: Bathroom|

In West Wickham, KB Renovations ripped out an old bathroom and supplied a new suite. We fitted new plumbing and electrics and then plastered the bathroom. The new suite was fitted along with tiling and finally the new room was decorated. What we did Area Date Project Time New Bathroom West Wickham 2024 8 days Project Results

Tiled Bathroom Beckenham

By |April 11th, 2024|Categories: Uncategorized|

For this bathroom in Beckenham we ripped out all of the old suite etc and fitted new plumbing and electrics. We plastered all walls then fitted the new bathroom suite. Finally we tiled the floor and half of the walls leaving half fresh plaster and half tiling for a good finish. What we did Area Date Project Time Tiled Bathroom Beckenham 2024 3 days Project Results

Kitchen Fitted Bromley

By |April 2nd, 2024|Categories: Kitchen|

Our customers based in Bromley had chosen a new Howdens Kitchen which they asked KB Renovations to install for them. We started the project by updating the plumbing and electrical systems and then plastered the walls. We then fitted the kitchen sink and began work on the worktops and cupboards. We laid the floor and finally painted the freshly plastered walls for a perfect finish. What we did Area Date Project Time Howdens Kitchen Bromley 2024 7 days Project Results

Shower in Loft Room Shortlands

By |April 2nd, 2024|Categories: Shower Room|

A shower room was installed in the loft of a property in Shortland's Bromley by KB Renovations. Following the conversion of the loft, we proceeded to fit the new shower room. The customer provided the tiles and bathroom fixtures, and we completed the installation according to their preferences. What we did Area Date Project Time Shower Room in Loft Shortlands 2024 2 days Project Results

Go to Top