Loft Bathroom Fitted in Bromley

By |April 23rd, 2024|Categories: Uncategorized|

KB Renovations fitted a new shower room in a newly constructed loft conversion in Bromley. New electrics and plumbing were installed before the walls were freshly plastered. We then tiled the floor and walls in different styles and then fitted a new vanity unit, towel rail and shower and toilet. What we did Area Date Project Time Loft Bathroom Bromley 2024 3 days Project Results

Bath and Shower Room Fitted Beckenham

By |April 15th, 2024|Categories: Bathroom|

KBRenovations were asked to modernise an old bathroom at a house in Beckenham. Our client wanted a stylish modern look so choose different styles of tiles for the floor, walls and shower including a floral patterned tile for the floor. The old bathroom was removed and new plumbing and electrics were installed. We plastered all walls and ceiling and then installed the new glass framed shower, modern vanity unit, chrome towel rail and cupboard. We cut the tiles around the suite and finally painted the ceiling. The result is a very stylish and modern bathroom.

Loft Bathroom Catford

By |April 15th, 2024|Categories: Bathroom|

This bathroom was fitted by KB Renovations in the customers newly renovated loft conversion in Catford SE6. The customer choose the bathroom tiles and a bath built in with shower unit above, small sink and a toilet as well as a towel rail. We tiled the floor, walls around bath and the side of the bath. Next, we fitted skirting boards.  We fitted a towel rail and an extractor fan, sink and toilet and then painted the room. What we did Area Date Project Time Loft Bathroom Catford 2023 5 Days

New Bathroom Fitted in West Wickham

By |April 15th, 2024|Categories: Bathroom|

In West Wickham, KB Renovations ripped out an old bathroom and supplied a new suite. We fitted new plumbing and electrics and then plastered the bathroom. The new suite was fitted along with tiling and finally the new room was decorated. What we did Area Date Project Time New Bathroom West Wickham 2024 8 days Project Results

Tiled Bathroom Beckenham

By |April 11th, 2024|Categories: Uncategorized|

For this bathroom in Beckenham we ripped out all of the old suite etc and fitted new plumbing and electrics. We plastered all walls then fitted the new bathroom suite. Finally we tiled the floor and half of the walls leaving half fresh plaster and half tiling for a good finish. What we did Area Date Project Time Tiled Bathroom Beckenham 2024 3 days Project Results

Kitchen Fitted Bromley

By |April 2nd, 2024|Categories: Kitchen|

Our customers based in Bromley had chosen a new Howdens Kitchen which they asked KB Renovations to install for them. We started the project by updating the plumbing and electrical systems and then plastered the walls. We then fitted the kitchen sink and began work on the worktops and cupboards. We laid the floor and finally painted the freshly plastered walls for a perfect finish. What we did Area Date Project Time Howdens Kitchen Bromley 2024 7 days Project Results

Shower in Loft Room Shortlands

By |April 2nd, 2024|Categories: Shower Room|

A shower room was installed in the loft of a property in Shortland's Bromley by KB Renovations. Following the conversion of the loft, we proceeded to fit the new shower room. The customer provided the tiles and bathroom fixtures, and we completed the installation according to their preferences. What we did Area Date Project Time Shower Room in Loft Shortlands 2024 2 days Project Results

Howdens Kitchen Fitted Beckenham

By |March 27th, 2024|Categories: Kitchen|

KB Renovations installed a Howdens kitchen which the customer had purchased but needed customising to fit their design ideas. We tailored the kitchen layout to their space, along with painting walls, tiling floors, and installing new electrical and plumbing systems. What we did Area Date Project Time Howdens Kitchen Install Beckenham 2024 3days Project Results

Bathroom Fitted Bromley

By |March 27th, 2024|Categories: Bathroom|

KB Renovations revamped an outdated bathroom at a property in Bromley, turning it into a stylish and practical shower room. We started by stripping out the old fixtures, making room for a fresh, modern look. Plumbing and electrical systems were upgraded for better functionality and safety. The plumbing got a complete overhaul to fit the new layout, ensuring reliable water flow. Electrical work was also done to meet modern standards. Tiling was a major part of the transformation, covering the entire space for a clean, contemporary feel. New fixtures like a modern toilet, sleek sink, and stylish radiator were

Shower Room Beckenham

By |March 27th, 2024|Categories: Shower Room|

In Beckenham, KB Renovations crafted a shower room for a client who recently expanded their loft. We tiled both the floor and shower enclosure, using tiles selected by the client. We then installed a custom-made glass door for the shower, complete with modern fixtures. We also plumbed and installed a new towel rail and bespoke sink unit and then fitted an extractor fan and LED ceiling lights. Completing the shower room, we applied a fresh coat of paint and sealed the room, ensuring a polished finish. What we did Area Date Project Time Shower Room