In Chislehurst, the client sought to revamp their compact shower space and incorporate underfloor heating. The project entailed stripping away the shower enclosure, towel rail, basin, and W/C, as well as all existing tiles and flooring.

Electrical adjustments were made to accommodate mirror lights, towel rail lights, and underfloor heating. Subsequently, all surfaces received a fresh coat of plaster. Plumbing alterations were carried out as needed.

A new shower unit and tray were then installed, complemented by panels in the shower area. The floor was prepped for underfloor heating, followed by tiling and grouting. Wall tiling and grouting were also completed, with the W/C and basin installed thereafter.

Additionally, a mirror/light cabinet, downlights, and a towel rail were added to complete the transformation.

What we did Area Date Project Time
Shower room + underfloor heating Chislehurst 2024 4 days

Project Results