Modern Bathroom Transformation on Avondale Road, Bromley

By |April 30th, 2025|Categories: Bathroom, Uncategorized|

Bathroom Renovation on Avondale Road, Bromley We completed a full bathroom renovation for a client on Avondale Road in Bromley. Designed for comfort, functionality, and modern aesthetics, this project reflects our commitment to detail and seamless project delivery. Project Highlights: ✅ Location: Avondale Road, Bromley✅ Design by: Steve at Penge Howdens✅ Worktop supplied by: Stones4Life ✅ Scope of work: Removed the old bathroom suite Upgraded plumbing and electrical systems Installed the new bathroom to exact design specifications Fully painted the room for a clean, contemporary finish Whether you're planning a full bathroom renovation or need reliable bathroom installers in

Complete Bathroom Renovation in Dulwich – 2-Week Transformation

By |April 24th, 2025|Categories: Bathroom, Uncategorized|

🛠️ Recent Project: Full Bathroom Renovation We recently completed a full bathroom refurbishment that showcases our attention to detail and expert craftsmanship. Here’s a breakdown of what we delivered: 🔧 Complete bathroom strip-out – Removed all existing fittings, fixtures, and wall/floor tiles 💡 Electrical & plumbing upgrades – Altered wiring and plumbing to suit the new layout ✨ Installed modern downlights and an extractor fan for improved lighting and ventilation 🛠️ Custom timber wall construction beside the bath, prepared with Wedi Board for waterproofing 🧱 All walls and ceilings professionally plastered for a flawless finish 🚿 Luxury bathroom suite

New Modern Bathroom Fitted Beckenham

By |November 5th, 2024|Categories: Bathroom|

This project was designed and supplied by Simply Plumbing Solutions In Bromley, including all tiles and the shower suite. KB Renovations removed the old bathroom suite, tiles, and towel rail, then altered the electrics and plumbing to suit the new layout. We lifted and installed new floorboards, plastered all walls and ceilings, and removed the door, door liner, and architrave, replacing them with new ones. Ditra matting was added to the floor, followed by tiling and grouting on all walls and floors. A pump was installed in the loft area, and we fitted the shower suite, lights, toothbrush chargers, and

Family Bathroom Refurbishment West Wickham

By |April 23rd, 2024|Categories: Bathroom|

In West Wickham, KB Renovations were tasked with the refurbishment of a family bathroom. The customer chose the bathroom suite and tiles they wanted including a glass shower partition, towel rail and vanity sink unit. We fitted new electrics and plumbing including power for a mirror cabinet (yet to be fitted). Walls were plastered then the new suite was installed. We tiled half of the wall for a 50/50 plaster - tiled effect and also the floor. Finally the room was painted and sealed. What we did Area Date Project Time Family Bathroom Refurbishment West

Bath and Shower Room Fitted Beckenham

By |April 15th, 2024|Categories: Bathroom|

KBRenovations were asked to modernise an old bathroom at a house in Beckenham. Our client wanted a stylish modern look so choose different styles of tiles for the floor, walls and shower including a floral patterned tile for the floor. The old bathroom was removed and new plumbing and electrics were installed. We plastered all walls and ceiling and then installed the new glass framed shower, modern vanity unit, chrome towel rail and cupboard. We cut the tiles around the suite and finally painted the ceiling. The result is a very stylish and modern bathroom.

Loft Bathroom Catford

By |April 15th, 2024|Categories: Bathroom|

This bathroom was fitted by KB Renovations in the customers newly renovated loft conversion in Catford SE6. The customer choose the bathroom tiles and a bath built in with shower unit above, small sink and a toilet as well as a towel rail. We tiled the floor, walls around bath and the side of the bath. Next, we fitted skirting boards.  We fitted a towel rail and an extractor fan, sink and toilet and then painted the room. What we did Area Date Project Time Loft Bathroom Catford 2023 5 Days

New Bathroom Fitted in West Wickham

By |April 15th, 2024|Categories: Bathroom|

In West Wickham, KB Renovations ripped out an old bathroom and supplied a new suite. We fitted new plumbing and electrics and then plastered the bathroom. The new suite was fitted along with tiling and finally the new room was decorated. What we did Area Date Project Time New Bathroom West Wickham 2024 8 days Project Results

Bathroom Fitted Bromley

By |March 27th, 2024|Categories: Bathroom|

KB Renovations revamped an outdated bathroom at a property in Bromley, turning it into a stylish and practical shower room. We started by stripping out the old fixtures, making room for a fresh, modern look. Plumbing and electrical systems were upgraded for better functionality and safety. The plumbing got a complete overhaul to fit the new layout, ensuring reliable water flow. Electrical work was also done to meet modern standards. Tiling was a major part of the transformation, covering the entire space for a clean, contemporary feel. New fixtures like a modern toilet, sleek sink, and stylish radiator were

Go to Top