KBRenovations undertook a bathroom renovation project in Orpington. Below is a list of services we carried out to turn an old bathroom into a fresh modern one.
- Removed the bath suite, tiles, and flooring.
- Replaced damaged floor joists caused by water damage.
- Altered pipework and electrics.
- Plastered all walls and ceilings.
- Tiled and grouted all walls.
- Installed a shower tray, shower, shower screen, vanity unit, mirror, extractor fan, and downlights.
- Painted the ceiling and woodwork.
- Supplied and installed a new consumer unit.
In the hallway:
- Removed the radiator.
- Plastered a water-damaged wall.
- Painted the hallway to complete the restoration.
What we did | Area | Date | Project Time |
---|---|---|---|
Bathroom Renovation | Orpington | 2024 | 3 days |